Draft Response Strategy Lines (0)
| AB3b (sorbent) |
| B-1 (>=42") |
| B-2 (18"-41") |
| B-2 Ebb (18"-41") |
| B-2 Flood (18"-41") |
| B-3 (<18") |
| B2 + Sorbent Boom |
| Bfire (fire) |
| Culvert Block |
| Deleted/Modified |
| On-water Skimming |
| Permanent |
| Shoreside Skimming |
| Snare |
| TS (tidal seal) |
| Underflow Dam |
| Wrack Removal |
| <all other values> |
Draft Response Strategy Points (1)
| Booming Strategy |
| Culvert Block |
| Skimming |
| Wrack Removal |
Notification Strategy Points (2)
Potential Staging Areas (3)
Potential Incident Command Posts (4)
|